Monday, May 21, 2007

Busy Monday



The paint remover is working so much better this spring than it did last fall. The work has barely started, but you can see lots of brick in the area that has been washed.

Disposal of the rinse water requires a little extra care. If you've driven by, you've noticed the orange safety fence. Inside the fence is a big lagoon made from sheet plastic and sand bags. It contains the rinse water until it can be be collected in this huge vacuum tank. The tank is drained into the sanitary sewer so the chemicals can be treated before the water is discharged. If we let it go directly into the storm drain on the corner, the water wouldn't be treated and the chemicals would just flow right through.

Saturday, May 19, 2007

Saturday Night 7:00

What a difference a day makes!


~ for reference, this is Apartment 1


Apartment 1 view 1; the entry hall with closet and powder room on the left


Apatrment 1 view 2; the kitchen as seen from the southeast corner


Apartment 1 view 3; the kitchen as seen from the northeast corner


~ and this is Apartment 2


Apartment 2 view 2; looking into the main living area from the entry hall


Apartment 2 view 5; looking toward the entry hall

Thursday, May 17, 2007

Drywall Coming Up!



First thing on Thursday morning, there is was. Stacks and stacks of the stuff.


When I left at 9:00, this was the scene.

Wednesday, May 16, 2007

Keep your eyes open

People in Washington have noticed that there are more openings on the second floor.



"Why?" they ask.



The simple answer is that we'll need a light source in each room when the drywall is installed, and we think/hope it's starting this week.

"Why don't you just take down all the plywood?" We need to wait until we can coordinate the removal of the plywood and the installation of the repaired window sashes. It's just a matter of (a brief) time before all the plywood will be gone!

Thursday, May 10, 2007

Friday, May 04, 2007

Friday Update

The picture tells the story. I won't say they actually got in each other's way, but there were FOUR crews at work on the building today.



Up in the apartments, Zager Plumbing was finishing the last bits of plumbing, and the plumbing inspector stopped by to see how it looked. Bob and Bill got an A +!

Higher up, in the apartment attics, Johnson Controls was working hard to finish the apartments' ductwork and return air vents.

The crew from Apex Construction returned today and wrapped up several small jobs - leveled one entry floor, added framing for the doorway arches in Apartment 2, and framed the kitchen walls and half walls.

Everyone working in the apartments is hurrying to finish their particular piece of the job before the drywall guys come in next week.

Meanwhile, down in the back basement, the concrete cutters from Iowa Bridge and Culvert were making a terrible racket with a concrete saw and a jack hammer. They're removing the existing concrete floor to permit construction of an exit hallway and restrooms with adequate headroom. More photos later when they're finished.

Thursday, April 26, 2007

Back to Front

Back in Apartment 2, the furnace and ductwork are being installed. We chose a Hi-Velocity unit which provides continuous air circulation instead of the usual On/Off system. We understand this will be a benefit to both the amount of energy needed to heat or cool the apartment, and to the problems caused by having high ceilings.



The ducts are just about 3 inches in diameter, and come already insulated. To compensate for the small diameter, the furnace fan moves the air faster when it's adding heat or cooling, hence the name Hi-Velocity.




Up front, in Apartment 1, the rough electrical wiring is being installed. At this point, you have to imagine furniture and TVs and computer desks - people actually living in this space!

Friday, April 20, 2007

Bryson Week In Review


Rough plumbing in both apartments is almost completed! Seen above is part of the bathroom in Apartment 2; drains and feed lines.



HVAC equipment has been lugged upstairs and most of it has been moved into the apartment attics. I'll save you the trouble of asking 'Where are the attics?"
Here ~

This shows just Apartment 2's attic. The ceiling in the hallway and bathroom/laundry room is only 8 feet high. A similar treatment is being used in the same areas of Apartment 1.


In Apartment 1, the new ceiling framing is being installed.

Stage 1

Stage 2


Back at home, we're cleaning up the doors which will be used for the bedrooms, bathrooms, and kitchen pantries. These doors have been here since 1876, and we don't see any reason to get rid of them now. They just need a little TLC and a fresh coat of paint. Under the blue and the green and the peach and the cream layers, we've discovered the original painted grain surface. Unfortunately, we don't have the skill or time to preserve it.




Down in the basement, the last piece a huge, HEAVY furnace is sitting quietly, waiting for Hercules to come back and finish ripping its guts out and hauling it away. This was a really awful job, but necessary to allow construction of a new exit from the basement. We think Hercules is quite a guy! Thanks, Ryan!!

Friday, April 13, 2007

No! Wait! Door Number One!

The entrance into Apartment 1 is a short hall with a large closet and a powder room on the left. Directly ahead is the back wall of the bedroom closet.



For reference, the arrows indicate where I stood to take the pictures. There is no Photo #5 in this set.





Photo #2 ~ The entry closet and powder room are on the left, the bedroom is on the right, and the opening in the center leads to the bathroom/laundry. The wall between the foyer and the kitchen hasn't been built yet.


Photo #3 ~ Again, the wall betweeen the entry and kitchen is missing. The post in the center of the picture is the only one that wasn't 'swallowed' by a wall. You can see it on the drawing as a little circle inside a box.


Photo #4 ~ We're facing the bathroom, with the diagonal bedroom closet on the right, and the bedroom doorway just beyond it, hidden by the closet framing. The powder room is in the foreground and the bathroom/laundry are behind it.

Bonus Photo



This was taken from the north west corner of the bedroom, looking toward the position of Photo #2.

Thursday, April 05, 2007

Door Number Two


Photo 1 location, one day later

Wednesday, April 04, 2007

Don't Look Now, but …

… that's a carpenter, and those are walls!

This is a view from the top of the stairs showing the entrance to Apartment 2. (OK, so there's no front door yet.) Let's call this Photo 1.



Use this map to figure out where I was standing when I took the pictures. The arrows tell which way the camera was aimed.




Photo 2, taken at the end of the entry hallway facing the living room windows.


Photo 3 looking from the west wall of the apartment through the dining room into the bathroom.


Photo 4 looking from the west wall of the apartment into the small central hallway that leads to the bedroom and bathroom. The little jog on the left is a closet.


Photo 5 is a view from the northwest corner of the living room looking back toward the southeast. The bedroom is the area behind the wall.

We just switched from demolition to construction!