Up in the apartments, Zager Plumbing was finishing the last bits of plumbing, and the plumbing inspector stopped by to see how it looked. Bob and Bill got an A +!
Higher up, in the apartment attics, Johnson Controls was working hard to finish the apartments' ductwork and return air vents.
The crew from Apex Construction returned today and wrapped up several small jobs - leveled one entry floor, added framing for the doorway arches in Apartment 2, and framed the kitchen walls and half walls.
Everyone working in the apartments is hurrying to finish their particular piece of the job before the drywall guys come in next week.
Meanwhile, down in the back basement, the concrete cutters from Iowa Bridge and Culvert were making a terrible racket with a concrete saw and a jack hammer. They're removing the existing concrete floor to permit construction of an exit hallway and restrooms with adequate headroom. More photos later when they're finished.