Hector is sealing the little irregularities in the tin ceiling before painting this section. Looking down is not an option -- this is the 26' high section! The mezzanine railing is visible just behind the scaffolding.
In other news ~
There is paint in the offices, and there is tile on the bathroom floor (singular - one down and one to go). The monster scaffold has moved to a new location and the ceiling and walls in that area are getting paint, too. Window trim has been installed over the main stairway.