Part of the remodeling for the Soup Kitchen in the basment includes lowering the exit to the alley.



The blue arrow shows the how high the floor was above the alley. The foundation was removed from that level down to alley level, a new floor will be poured (Monday, I think), and then stairs will be built from the basement to the new exit.

Also in progress this week ~

Johnson Controls spent time on the roof getting the air conditioners ready.

Insulation was installed between the basement ceiling and the main floor, primarily as a sound barrier. We hope to see sheet rock on the ceiling next week.

Zager's labor force dug in the drains and lift station for the basement restrooms.

Another section of paint was removed from the north wall.

Everyone went home tired every night. I call that a successful week!

1 comment:

Anne Koski said...

And new light fixtures & shades were ordered. Yes!